Case Studies
The Challenge Produce a film showcasing Colas Rail UK’s continuing track works at Cambridge South. We’re already familiar with this project, …
The Challenge Create a piece of media capturing the vital maintenance and renewal of tram track works taking place in Sandilands, …
The deck install for the UK's first beacon bridge by Amco Giffen. We recorded this stunning installation in just a single night.
Learn about the challenges of the Severn Tunnel renewal through our capture of the works for Colas Rail UK.
Observe this stunning bridge beam lift we captured for Galliford Try, a major milestone along their 'North-East Melton Mowbray Distributor Road' project.
Watch as we capture the spirit and overall achievement of the students who took part in Porterbrook's annual celebration, Primary Engineer.
The East Midlands Reserve Forces and Cadets Association unveiled their brand new vehicle workshop and we captured the wide array of new features which make this such a worthy investment for the association.
We produced a film for Colas Rail UK showing their work on the Terras level crossing upgrade.
We covered the full demolition and reconstruction of a rail bridge for Amco Giffen, as they worked tirelessly on the bridge replacement at Ashopton, Derbyshire.
We captured the CRSA's vital Easter works from River Mersey in the north west, all the way to Kensall Green in outer London.
We captured the progress updates for G F Tomlinson's 127,000 sqaure ft warehouse construction for ATL Warehousing & Distributing.
Watch as we take a deep dive into the final phase of the Northumberland Line Project.